Skip links

Gas lift Turnkey project (5 MMSCFD from 37 PSI suction to 1,300 PSI discharge pressure) – WEPCO

Project Details

Project Type:

Gas Lift Project

Location:

Badr 1 – Western Desert

Customer:

Western Desert Petroleum Co.

Project Duration:

2016 / 2017

Request a Quote

    Project Details

    Project Type:

    Gas Lift Project

    Location:

    Badr 1 – Western Desert

    Customer:

    Western Desert Petroleum Co.

    Project Duration:

    2016 / 2017

    Project Description

    Power House Egypt supplied a rental gas compressor to Western Desert Petroleum Company (WEPCO) for their Gas Lift Project at Badr-1 in the Western Desert. The solution delivered 5 MMSCFD of gas, boosting pressure from 37 psi suction to 1,300 psi discharge, ensuring reliable lift performance across the field.

    Our team handled full installation, commissioning, and on-site technical support throughout the 2016–2017 operation period. This rental setup provided WEPCO with a cost-efficient, high-availability compression solution that improved production continuity without the need for long-term capital investment.

    30+

    Years of Experience

    24/7

    Technical Support

    ISO-Certified

    Related Services