Skip links

Booster Gas Compressor Turnkey Project (5 MMSCFD from 1.5 Bar suction to 68 Bar discharge pressures) – General Petroleum Company

Project Details

Project Type:

Rental of Gas Compressor at GPC Western Desert Field

Location:

GPC – Abu Sannan field

Customer:

General Petroleum Co.

Project Duration:

2017 / 2022

Request a Quote

    Project Details

    Project Type:

    Rental of Gas Compressor at GPC Western Desert Field

    Location:

    GPC – Abu Sannan field

    Customer:

    General Petroleum Co.

    Project Duration:

    2017 / 2022

    Project Description

    Power House Egypt delivered a complete rental gas compression solution for General Petroleum Company (GPC) at the Abu Sannan field in the Western Desert. From 2017 to 2022, our team supplied and operated a high-performance booster gas compressor, enabling reliable handling of 5 MMSCFD of natural gas. The system increased pressure from 1.5 bar suction to 68 bar discharge, meeting GPC’s production and transportation requirements with consistent efficiency.

    This turnkey rental project included installation, commissioning, operational support, and continuous monitoring to ensure stable performance under desert field conditions. By choosing a rental model, GPC benefited from reduced downtime, optimized gas flow, and a cost-effective alternative to purchasing permanent compression equipment.

    30+

    Years of Experience

    24/7

    Technical Support

    ISO-Certified

    Related Services